US Congress Authorizes Beaver Dam Construction

Beaver Dam Construction

Construction is authorized under the Flood Control Act for the purposes of flood control and generation of hydroelectric power.  However, in the case of Beaver Dam and the creation of Beaver Lake, the cost-benefit analysis was unfavorable for the dam construction just for the purposes of flood control and hydroelectric power.