By mid-1971, an expansion of the water treatment plant to a design capacity of 25 MGD and an overload capacity of 32 MGD was completed.
By mid-1971, an expansion of the water treatment plant to a design capacity of 25 MGD and an overload capacity of 32 MGD was completed.